To solve the problems, from 1991 to 1993, Korea Advanced Institute of Science and Technology (KAIST) and Daewoo jointly conducted the Daewoo Shipbuilding Scheduling (das) Project. To integrate the scheduling expert systems for shipbuilding, we used a hierarchical scheduling architecture. To automate the dynamic spatial layout of objects in various areas of the shipyard, we developed spatial scheduling expert systems. For reliable estimation of person-hour requirements, we implemented the neural network-based person-hour estimator. In addition, we developed the paneledblock assembly shop scheduler and the longrange production planner.