Timeline-Based Space Operations Scheduling with External Constraints
Chien, Steve (Jet Propulsion Laboratory, California Institute of Technology) | Tran, Daniel (Jet Propulsion Laboratory, California Institute of Technology) | Rabideau, Gregg (Jet Propulsion Laboratory, California Institute of Technology) | Schaffer, Steve (Jet Propulsion Laboratory, California Institute of Technology) | Mandl, Daniel (Godard Space Flight Center) | Frye, Stuart (SGT/GSFC)
We describe a timeline-based scheduling algorithm developed for mission operations of the EO-1 earth observing satellite. We first describe the range of operational constraints for operations focusing on maneuver and thermal constraints that cannot be modeled in typical planner/schedulers. We then describe a greedy heuristic scheduling algorithm and compare its performance to both the prior scheduling algorithm - documenting an over 50% increase in scenes scheduled with estimated value of millions of dollars US. We also compare to a relaxed optimal scheduler showing that the greedy scheduler produces schedules with scene count within 15% of an upper bound on optimal schedules.
May-1-2010
- Country:
- North America > United States
- Rhode Island > Providence County
- Providence (0.04)
- Maryland > Prince George's County
- Greenbelt (0.04)
- California
- San Francisco County > San Francisco (0.04)
- Monterey County > Monterey (0.04)
- Los Angeles County > Pasadena (0.04)
- Rhode Island > Providence County
- Europe
- Netherlands > South Holland
- Noordwijk (0.04)
- Germany > Baden-Württemberg
- Karlsruhe Region > Heidelberg (0.04)
- Netherlands > South Holland
- North America > United States
- Industry:
- Technology: