Scheduling with neural networks: The case of the Hubble space telescope

Johnston, M. D. | Adorf, H.-M.

Classics 

Creating an optimum long-term schedule for the Hubble Space Telescope is difficult by almost any standard due to the large number of activities, many relative and absolute time constraints, prevailing uncertainties and an unusually wide range of timescales. This problem has motivated research in neural networks for scheduling. The novel concept of continuous suitaility functions defined over a continuous time domain has been developed to represent soft temporal relationships between activities. All constraints and preferences are automatically translated into the weights of an appropriately designed artificial neural network. The constraints are subject to propagation and consistency enhancement in order to increase the number of explicitly represented constraints.